Adampankulam Freeder Canal Project
Assignment Name:
Engineering Consultancy services for preparation of Feasibility Reports & Detail Designs of Pali Aru Diversion Weir , and Survey of Adampankulam Freeder Canal.
Country: Sri Lanka
Project Value: US $ 0.35 Million
Location within country: Vellankulam , Mannar
Name of client:
Mannar Rehabilitation Reconstruction through community Participatory Approach Project – Assisted By The JICA.
Address: Project Office ( MANRECAP ) Kachcheri ,Mannar
Start date: January / 2005
Completion date: March / 2005
Name of associated firm:
No of staff: 07
No of staff months: 18
Approximate value of consultancyt: 22,300.00
Associate consultant's man months:
Senior staff involved and functions performed:
Description of the project:
The JICA , MANRECAP engineers contacted Irrigation Engineer Mannar to obtain their approval for study on improvement of the Weir and taking water to Karayankannadi Irrigation scheme from the left bank of the river. MANRECAP decided to out source survey, investigation, study ,design and preparation of tender document through a consulting services and to invite reputed consulting firms to submit quotations for the said works. JICA funded for the project. M/s Project Management Associate International (Pvt.) Ltd. is selected as a Consultant to this project.
Description of services provided:
Prepare feasibility reports, Economic analysis, Conceptual and preliminary engineering designs. Prepare detail engineering designs and drawings for the as developed conceptual design and approved under feasibility study. Prepare bid documents for local competitive bidding as per Asian Development Bank (ADB) guidelines.